2009 Asset Valuation Summary

The table below shows the total replacement cost, written down value & accumulated depreciation of all BRC assets, broken up into asset sub-categories as at 30 June 2009.

Description Replacement Cost WDRC Accumulated Depreciation
Artworks $418,934.26 $418,934.26 $0.00
Bridges (Super Structure) $31,775,862.80 $20,126,391.81 $11,649,470.99
Bridges (Sub Structure) $11,489,169.55 $7,335,727.81 $4,153,441.74
Bridges (Rail) $1,588,793.14 $977,120.65 $611,672.49
Bridges (Surface) $671,580.00 $399,425.32 $272,154.68
Buildings (Floor) $31,261,514.18 $28,388,410.56 $2,873,103.62
Buildings (Envelope) $67,284,493.25 $63,275,042.22 $4,009,451.04
Buildings (Floor Coverings) $4,705,812.01 $3,623,353.36 $1,082,458.66
Buildings (Internal Screens) $1,780,416.35 $1,672,338.07 $108,078.28
Buildings (Roof) $22,709,321.49 $19,907,740.79 $2,801,580.70
Buildings (Mechancial Services) $7,439,198.85 $6,076,349.39 $1,362,849.46
Buildings (Fire Services) $1,049,798.60 $1,021,519.98 $28,278.62
Buildings (Transport Services) $428,000.62 $417,307.46 $10,693.16
Buildings - Market Value $2,722,896.72 $1,247,020.00 $1,475,876.72
Ponds $3,691,406.76 $3,588,139.99 $103,266.77
Stormwater Pipes $102,703,072.24 $62,514,046.64 $40,189,025.60
Intangibles $5,756,323.16 $5,283,425.65 $472,897.51
Equipment & Plant $6,888,271.45 $4,042,293.03 $2,845,978.42
Traffic Management Devices $5,395,255.23 $3,974,182.26 $1,421,072.97
Sewerage Treatment & Pumping $101,735,810.52 $91,040,137.03 $10,695,673.49
Water Treatment & Storage $79,304,629.37 $74,119,716.36 $5,184,913.00
Footpaths $12,278,950.03 $10,114,634.74 $2,164,315.29
Kerbs $31,897,882.47 $24,418,509.66 $7,479,372.82
Land $103,115,955.21 $103,115,955.21 $0.00
Other Structures $22,065,865.95 $17,302,498.94 $4,763,367.01
Stormwater Pits $28,878,594.23 $22,648,467.59 $6,230,126.64
Roads (Pavement) $475,936,023.76 $387,768,986.14 $88,167,037.62
Roads (Surface) $114,186,214.69 $75,983,147.05 $38,203,067.64
Roads (Formation) $178,023,397.61 $176,624,430.70 $1,398,966.91
Sewer Distribution Pipes $132,097,307.28 $76,940,354.67 $55,156,952.60
Sewer Distribution Manholes $26,072,370.78 $19,695,862.07 $6,376,508.71
Water Distribution (Pipe) $147,962,412.79 $94,574,439.29 $53,387,973.50
Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License